Login for faster access to the best deals. Click here if you don't have an account.

2020 Honda Civic 1.0 VTEC TURBO EX (s/s) Hatchback 5d PROFESSIONAL

May 14th, 2025 at 11:16   Automobiles   Yeovil   16 views Reference: 173793

Location: Yeovil

Price: 15,189 £


2020 Honda Civic 1.0 VTEC Turbo EX: Excellent Condition & Full History

Howards Used Car Centre presents a silver 2020 Honda Civic 1.0 VTEC Turbo EX Hatchback, boasting a comprehensive service history and offering peace of mind. Serviced recently on August 19th, 2024, at 28,454 miles, this Euro 6 compliant vehicle comes with a 6-month RAC warranty including breakdown cover, plus a fresh service & 12-month MOT upon purchase. Discover why Howards consistently holds the UK's highest automotive Reputation score.

Key Features & Benefits

This Honda Civic delivers a blend of performance and luxury. It features a sunroof, sat nav, leather interior with heated front & rear seats, and advanced safety technology. The car provides a smooth driving experience thanks to adaptive cruise control and dual-zone air conditioning. With its impressive feature set and Howards' commitment to customer service, this Civic is an exceptional choice.

Detailed Specifications & Technology

  • Engine: 1.0 VTEC Turbo
  • Transmission: Automatic
  • Emission Standard: Euro 6
  • Warranty: 6-Month RAC Warranty
  • MOT: 12-Month MOT upon purchase

Premium Features & Comfort

  • Sunroof for enhanced driving enjoyment.
  • Leather interior with heated front and rear seats, offering ultimate comfort.
  • Apple Carplay & Android Auto integration for seamless connectivity.
  • Advanced safety features including parking sensors, reversing camera, and adaptive cruise control.

Why Choose Howards Used Car Centre?

  • Exceptional Customer Service: We pride ourselves on a customer-focused experience.
  • High Reputation Score: Currently holding the highest automotive Reputation score in the UK.
  • Convenient Purchase Options: Choose between dealership handover or Howards at-home delivery service.*
  • 14 Day Money Back Guarantee:*Charges apply from £49.-**

Additional Information

  • Wheels: 17in Alloy Wheels - Grey
  • Connectivity: 2x USB Jack and HDMI Jack, Bluetooth Hands Free Telephone - HFT
  • Safety: Collision Mitigation Braking System - CMBS, Road Departure Mitigation
  • Comfort: Power Lumbar Adjustment for Driver & Passenger Seats
  • Audio: Premium Audio - 11 Speakers, Subwoofer

Additional Details

Body Type
Hatchback
Color
Silver
Doors
5 doors
Car Brand
Honda
Car Model
Civic
Year of registration
2020
Fuel Type
Petrol
Transmission
Manual
Condition
Used
Mileage
33205
Features:
AUX/USB connectivity
Adaptive cruise control
Air conditioning
Alarm/immobiliser
Alloy wheels
Bluetooth
Climate control
Cruise control
DAB radio
Heated seats
ISOFIX
Leather seats
Parking assist.
Privacy glass/tinted windows
Reversing camera
Satellite navigation
Sunroof/panoramic roof