Login for faster access to the best deals. Click here if you don't have an account.

2021 Vauxhall Crossland 1.2i SE PROFESSIONAL

May 23rd, 2025 at 01:37   Automobiles   Chesterfield   22 views Reference: 189786

Location: Chesterfield

Price: 9,299 £


Welcome to Perrys Ford Chesterfield with over 100 used cars on site. We are pleased to offer this great value Vauxhall Crossland 1.2 SE 5 Door in Black. Features on this popular family car include air conditioning, electric windows front and rear, electric mirrors, cruise control, automatic headlights, DAB radio, USB and Bluetooth. You can reserve the vehicle for a fully refundable £99. If you dont see the car you want, just ask! We can source most makes and models. A £99 administration fee is applicable to the advertised price upon purchase of this vehicle. Refer to our terms and conditions for details.[!@@Additional Info@@!], ABS, Air Conditioning, Engine Immobiliser, Locking Wheel Nuts, Centre Console, Heated Rear Window, Visible Vehicle Identification Number, Service Interval Indicator, Reach + Rake Adjustable Steering Column, Headlamp Levelling, Rear Reading Lights, Energy Absorbing Steering Column, Reinforced Passenger Safety Cell, Deformation Zones Front And Rear, Side Window Demist Vents, Intermittent Rear Wash/wipe, Body Colour Door Handles, Side Impact Protection Beams, Reversing Light, Outside Temperature Display With Ice Warning, Rear Door Pockets With Bottle Holders, Speed Sensitive Power Steering, Multi Function Trip Computer, Glovebox With Lid, Illuminated Load Area, 2 Speed Wipers/wash Wipe/intermittent Wipe, Height Adjustable Front/rear Head Restraints, Seatbelt Load Limiter, Cruise Control + Speed Limiter, Passenger Airbag Deactivate Switch, Tinted Windows, Interior Courtesy Light Operated By All Doors, Audible Lights On Warning, Isofix System On Outer Rear Seats, Electrically Adjustable And Heated Door Mirrors, Passenger Assist Handles, Luggage Compartment Cover, Front Map Reading Lights, ESP + Traction Control, Rear Seat Belt Pretensioners, Front Door Pockets With Bottle Holders, 2 Way Adjustable Front Passenger Seat, Tyre Pressure Monitoring System, Folding Key, Hill Start Assist, Remote Central Deadlocking, Hydraulic Brake Assist (HBA), Child Locks On Rear Doors, 3x3 Point Rear Seatbelts, Courtesy Light, Automatic Lighting Control, Lane Departure Warning System

Additional Details

Body Type
Hatchback
Color
Black
Doors
5 doors
Car Brand
Vauxhall
Car Model
Crossland
Year of registration
2021
Fuel Type
Petrol
Transmission
Manual
Condition
Used
Mileage
42549
Features:
AUX/USB connectivity
Air conditioning
Alarm/immobiliser
Bluetooth
Cruise control
DAB radio
ISOFIX
Privacy glass/tinted windows