2022 Land Rover Range Rover Evoque 2.0 D200 R- Dynamic HSE PROFESSIONAL
Jun 24th, 2025 at 09:57 Automobiles Crawley 4 views Reference: 261498Location: Crawley
Price: 31,490 £
MINIMUM OF 24 MONTHS WARRANTY OFFER WHEN FINANCING THROUGH JLRFS, T'S & C'S APPLY LAND ROVER SERVICE HISTORY** FIXED PANORAMIC SUNROOF, REAR VIEW CAMERA, APPLE CAR PLAY, ANDROID AUTO, BLUETOOTH CONNECTIVITY, DAB RADIO, SATELLITE NAVIGATION, 10 INCH INFOTAINMENT TOUCH SCREEN AT FRONT, PRIVACY GLASS,HEATED FRONT WINDSCREEN AND STEERING WHEEL FOR THOSE FROSTY MORNINGS, ELECTRIC HEATED FRONT SEATS WITH DRIVER MEMORY, MERIDIAN SURROUND SOUND SYSTEM, SANTORINI BLACK EXTERIOR, 20'' GLOSS BLACK ALLOYS, 4WD - ALL WHEEL DRIVE, AUTO HIGH BEAM ASSIST, AUTOMATIC HEADLAMP LEVELLING, BLIND SPOT ASSIST, CABIN LIGHTING, BODY COLOURED ROOF, DAYTIME RUNNING LAMPS, CARPET FLOOR MATS, FRONT AND REAR PARK AID+, METAL FINISH FOOT PEDALS, GLOSS BLACK GRILLE, MORZINE HEADLINING, PREMIUM LED HEADLAMPS, INTERIOR REAR VIEW MIRROR WITH AUTO DIMMING, LANE KEEP ASSIST WITH UPCOMING TRAFFIC DETECTION, - HARWOODS LANDROVER CRAWLEY are delighted to offer this Range Rover Evoque,2.0 D200 MHEV R-Dynamic HSE SUV 5dr Diesel Auto 4WD Euro 6 (s/s) (204 ps). Be assured all approved Land Rovers are offered with a minimum 12 months Land Rover approved warranty and European roadside assistance. Our Land Rover Technicians carry out a 169-point check on every vehicle, as well as independent mileage and history checks. **(As a Land Rover approved centre we can service Urban or Overfinch converted vehicles too)** *** We are proud to be part of the Harwoods group, a family run business established in 1931** With 3 Approved Land Rover retailers within our group, we have access to over 500 vehicles. If this isn't the right car for you, please contact us and we will find it. Other colours are available Black, Blue, White, Grey. We look forward to seeing you***-PAN ROOF, CAMERA, SAT NAV-*** We are proud to be part of the Harwoods group, a family run business established in 1931***[!@@Additional Info@@!]10in Deployable Touchscreen with Lower Touchscreen, 14-Way Heated Electric Seats with Driver Memory and 2-Way Manual Headrests, 20in Alloy Wheels - Style 5079 - Diamond Turned with Gloss Dark Grey Contrast, 40-20-40 Folding Rear Seats, ABS - Anti Lock Braking System, ACC - Adaptive Cruise Control, ATPC - All Terrain Progress Control, All Season Tyres, Ambient Interior Lighting, Analogue Dials with Central TFT Display, Android Auto, Animated Directional Indicators, Apple CarPlay, Approach Lights, Auto-Dimming Interior Rear View Mirror, Automatic Headlight Levelling, Automatic Headlights, Blind Spot Assist, Bluetooth Connectivity, Body Coloured Roof, Brake Pad Wear Indicator, Bright Metal Pedals, Cabin Lighting, Carpet Mats, Chrome Treadplates, Configurable Dynamics, Customer Configurable Autolock, DAB - Digital Audio Broadcast, DSC - Dynamic Stability Control, Driver Condition Monitor, EBA - Emergency Brake Assist, EBD - Electronic Brake-Force Distribution, EPAS - Electronic Power Assisted Steering, ETC - Electronic Traction Control, Efficient Driveline, Electric Parking Brake, Electric Windows with One-Touch Open-Close and Anti-Trap, Emergency Braking, Evoque Badge, Extended Leather Upgrade, Fixed Panoramic Roof Including Powered Blind, Flush Deployable Door Handles, Front and Rear Parking Aid, HDC - Hill Descent Control, Headlights - Automatic High Beam Assist, Headlining - Ebony Morzine, Heated Electric Power Fold Door Mirrors with Approach Lights and Auto-dimming Driver Side, Heated Rear Window with Timer, Hill Launch Assist, Intrusion Sensor, Keyless Entry, Lane Keep Assist, Locking Wheel Nuts, Low Traction Launch, Manually Adjustable Steering Column, Meridian Surround Sound System, Online Pack with Data Plan, Overhead Lighting Console, Overhead Stowage for Sunglasses, Passive Front Headrests, Passive Suspension, Perforated Full Leather Steering Wheel, Pivi Pro - Connected, Power Operated Child Locks, Power Socket Pack 1, Powered Tailgate, Premium LED Headlights with Signature DRL, Push Button Start, R-Dynamic Exterior Pack, RSC - Roll Stability Control, Rain Sensing Windscreen Wipers, Rear Air Vents, Rear Centre Headrest, Rear Collision Monitor, Rear Fog Lights, Rear ISOFIX, Rear Traffic Monitor, Rear View Camera, Remote, Satin Chrome Gearshift Paddles, Seat Belt Reminder, Secure Tracker - 12 Month Subscription, Six Airbags, Steering Wheel - Heated, Sun Visors - Illuminated Vanity Mirrors, TPMS - Tyre Pressure Monitoring System, TVBB - Torque Vectoring by Braking, Tailgate Spoiler, Terrain Response 2, Traffic Sign Recognition and Adaptive Speed Limiter, Trim Finish - Gradated Linear Dark Aluminium, Twin Sliding Front Centre Armrest, Two-Zone Climate Control, Windscreen - Heated, Windscreen Washer Jets - Heated, Wireless Device Charging, 20in Alloy Wheels - Style 5079 - Gloss Black, Privacy Glass, Santorini Black