2023 Audi Q5 2.0 45 TFSI S Line Station Wagon PROFESSIONAL
Apr 1st, 2025 at 03:16 Automobiles Stafford 44 views Reference: 28732Location: Stafford
Price: 36,790 £
Alloys, Heated Seats;Here at Stafford Audi we are pleased to have into stock this Audi Approved Used Audi Q5 S line 45 TFSI quattro 265 PS S tronic. This Audi comes well-equipped with a Euro 6 compliant 1.9L petrol engine, paired with an automatic S-tronic transmission and quattro all-wheel drive for enhanced performance and handling. The S-line trim adds a sporty touch, while the Daytona Grey Pearl Effect paint gives it a sleek and sophisticated look. It also features stunning 19" 5-arm rotor alloy wheels in graphite grey with a gloss-turned finish, further enhancing its aggressive stance and premium appeal. The Audi Q5 has a boot space of 520 liters, expanding to 1,520 liters with the rear seats folded, and features a wide loading area, low loading lip, and a power-operated tailgate for added convenience. The vehicle is equipped with Matrix LED headlights featuring dynamic indicators, providing enhanced visibility and a modern aesthetic. At the rear, LED combination lamps with a dynamic light design and dynamic turn signals further enhance its sophisticated look. For added convenience and safety, the car also includes a reversing camera along with front and rear parking sensors, making parking and maneuvering easier in various driving conditions. The car features microfiber and leather contrast seats, providing a stylish and comfortable interior. The heated front seats ensure warmth during colder days, while the front seats also come with 4-way lumbar support for added comfort. Additionally, th...[!@@Additional Info@@!]19" x 8.0J '5-arm rotor' graphite grey - gloss turned finish alloy wheels with 235/55 R19 tyres,Digital Matrix Headlights,Camera and/or distance sensor (driver assistance system),Without 4A4 Rear Heated Seats,Matrix LED headlights with coming/leaving home animations,Matrix LED headlights with dynamic indicators,LED rear combination lamps with dynamic light design and dynamic turn signal ,Headlight washer system,Equipment options subset for Great Britain