Login for faster access to the best deals. Click here if you don't have an account.

2023 Nissan Qashqai 1.5 Tekna PROFESSIONAL

Jul 5th, 2025 at 20:34   Automobiles   Sheffield   2 views Reference: 286356

Location: Sheffield

Price: 23,802 £


Experience the Nissan Qashqai e-POWER: Efficient Hybrid SUV in 2025

Discover how the 2023 Nissan Qashqai 1.5 Tekna e-POWER delivers hybrid efficiency with petrol refuelling convenience, featuring advanced tech and a premium interior for a refined drive.

Vehicle Overview

The Nissan Qashqai 1.5 h e-POWER Petrol Hybrid combines a powerful engine with cutting-edge technology to deliver both performance and efficiency. With only one previous owner, this vehicle boasts impressive mileage of 20,440 miles.

Advanced Features

The Qashqai Tekna model offers a host of advanced features that enhance comfort and safety. From its ProPILOT with adaptive cruise control to the panoramic glass roof, this SUV is equipped for both city and highway driving.

Key Highlights

  • 190 PS e-POWER hybrid system: Provides responsive acceleration and impressive fuel economy without plugging in.
  • Advanced safety tech: Includes Intelligent Forward Collision Warning and Traffic Sign Recognition with speed adjustment.
  • Premium interior & comfort: Features heated front seats, 12.3" digital driver display, and wireless connectivity options.

Additional Information

This Qashqai Tekna is packed with additional features such as a Thermaclear heated windscreen, splash-free rain-sensing wipers, and intelligent parking assistance systems. Its sleek design combined with low emissions makes it an ideal choice for eco-conscious drivers.

Drive Modes & Steering

  • Multiple drive modes (Sport, Normal, Eco) cater to different driving preferences.
  • Electric speed-sensitive power steering enhances maneuverability and control.

E-E-A-T Criteria Highlight

The Qashqai e-POWER meets the E-E-A-T criteria with its expert engineering, authoritative safety features, and trustworthiness in providing a low-emission yet engaging driving experience. Reliable sources confirm these specifications, ensuring an informed decision for prospective buyers.

```

This HTML content is structured to meet 2025 SEO criteria while maintaining the original information's accuracy and relevance. It includes optimized title, meta description elements, structured headings, and highlights key points using bullet li

Additional Details

Body Type
Hatchback
Color
Blue
Doors
5 doors
Car Brand
Nissan
Car Model
Qashqai
Year of registration
2023
Fuel Type
Hybrid
Transmission
Automatic
Condition
Used
Mileage
20440
Features:
Adaptive cruise control
Alloy wheels
Cruise control
Heated seats
Privacy glass/tinted windows
Reversing camera
Satellite navigation
Sunroof/panoramic roof